We perform the following operations:

Data used to track, manage, and optimize resources.
Post Reply
zihadhosenjm40
Posts: 523
Joined: Sat Dec 21, 2024 3:31 am

We perform the following operations:

Post by zihadhosenjm40 »

It is important to choose the right fasteners so that they fit the wall material. The device may come with a special fastening strip.

We mark the wall. If the device is fixed to a strip, we apply it to the wall, check the horizontal and mark the places for the fasteners.
Prepare the holes. Use a hammer drill or a perforator to make the holes and insert the fasteners into them.
We hang the device and secure it securely.
If the water heater model does not provide for a mounting strip, the body is supplied with brackets with lugs.

In this case, it is necessary to mark the russia mobile database especially carefully, since in case of an error, the eyes simply will not fall on the hooks.

The heater must be installed in strict accordance with its design, so that all horizontal and vertical pipes are located exactly as recommended by the manufacturer.

In addition, the hooks on the wall must be installed in such a way that spontaneous movement of the device along the wall is completely excluded.


Connection to the water supply

The manufacturer applies markings to the heater tank indicating the hot and cold water connection points. They are marked in red and blue.

When connecting the device to the pipelines, shut-off valves should be installed on both main lines and a non-return safety valve on the cold water pipe.
Post Reply